Triangulation Survey Procedure

Triangulation Survey Procedure: In surveying, triangulation is the manner of determining the region of a factor by way of measuring handiest angles to it from recognised points at both give up of a set baseline, in preference to measuring distances to the point immediately as in trilateration. The point can then be fixed because the third factor of a triangle with one known aspect and two acknowledged angles.

Triangulation Survey Procedure


Triangulation Survey Procedure Full Details 

Triangulation can also seek advice from the correct surveying of structures of very huge triangles, known as triangulation networks.


By making use of trigonometry and the measured length of simply one aspect, the alternative distances in the triangle are measured. The shape of the triangles could be very crucial as there may be numerous mistakes in a protracted thin triangle, but one having base angles of approximately 45 ranges is perfect.


Each of the distances already calculated is then carried out as one side in every other triangle to exercise session the distances to any other point, which sequentially can set up any other triangle.


As needed, it is carried out regularly to expand a chain of triangles which join the starting place point to the Survey Control within the required vicinity.

SURVEYING

Triangulation Survey Procedure

December 24, 2021 - by means of Kathir - Leave a Comment


In surveying, triangulation is the manner of figuring out the vicinity of a point by means of measuring only angles to it from recognized points at both quit of a hard and fast baseline, in preference to measuring distances to the factor directly as in trilateration. The factor can then be constant as the 0.33 factor of a triangle with one recognized aspect and  acknowledged angles.


Triangulation also can talk over with the correct surveying of systems of very big triangles, referred to as triangulation networks.


By making use of trigonometry and the measured length of simply one aspect, the opposite distances inside the triangle are measured. The form of the triangles could be very vital as there may be numerous errors in a long skinny triangle, however one having base angles of about forty five stages is best.


Each of the distances already calculated is then applied as one facet in any other triangle to workout the distances to another factor, which sequentially can set up any other triangle.


As wished, it's far achieved regularly to develop a sequence of triangles which join the origin factor to the Survey Control in the required area.


The angles and distances are then applied with the preliminary recognized position, and complex formulae, to calculate the placement (Latitude and Longitude) of all other factors within the triangulation network.


The calculated distance in the first triangle is called as the ‘Baseline’ and is the only distance measured; all the relaxation are computed from it and the measured angles.


The process is very simple to compute the location of proper perspective triangle, however in case the triangle isn't always proper attitude, the method becomes complex. In the tutorial, given underneath, you'll discover ways to simplify this complex manner with the usage of some formulation.

triangulation survey procedure pdf

The method may be observed in surveying calculation.

To begin with, you have to calculate the coefficient of triangle “S”.

S = ½ x (a+b+c), here a,b,c represent three sides of the triangle. AB as first side, BC as second side and CA as third side. AB is represented as A, BC represented as B and CA represented as C. Their values are given as follow :-

AB = 5 meter, BC = 8 meter and C = 12 meter

By putting these values, we get S = ½ (5+8+12) = 12.5

Post a Comment

Please Select Embedded Mode To Show The Comment System.*

Previous Post Next Post